深厚软土层上“三合一”船进退法分层回填关键工艺.
Title: | 深厚软土层上“三合一”船进退法分层回填关键工艺. |
---|---|
Alternate Title: | Key technology of layered backfilling by "self-priming and self-unloading" ship advance and retreat method on deep soft soil layers. |
Authors: | 王军伟1 303661244@qq.com, 王远峰2, 张壮壮2, 李承柱2 |
Source: | China Harbour Engineering. Oct2024, Vol. 44 Issue 10, p91-96. 6p. |
Subject Terms: | *SOIL depth, *QUALITY control, *VOLUME measurements, *PROBLEM solving, *SILT |
Abstract (English): | In order to solve the problems of high water content, low strength and large average thickness of the soft soil layer in the backfilling operation area in the reclamation development project (Phase I) of the SM Group in Pasai City, Philippines, when direct reclamation is carried out, the foundation is prone to silt squeezing and local instability, which affects the quality of subsequent construction, the key technology of layered backfilling by the "self-priming and self-unloading" ship advance and retreat method on deep soft soil layer is proposed, and the technology is optimized from the aspects of advance and retreat construction, volume measurement, construction fleet scheduling, etc. The key technology of layered backfilling by the "self- priming and self-unloading" ship advance and retreat method under the backfilling on deep soft soil layers has high construction efficiency, effectively solving the quality control problem of backfilling construction on deep soft soil layers, and can provide reference and inspiration for large-scale reclamation projects under deep water conditions. [ABSTRACT FROM AUTHOR] |
Abstract (Chinese): | 为了解决在菲律宾帕賽市-SM集团吹填开发项目 (1期) 中存在的回填作业区软土层含水率高、强度低, 平 均厚度大, 直接吹填施工时, 地基极易出现挤淤及局部失稳, 影响后续施工质量的问题, 提出了深厚软土层上的 “三合一”船进退法分层回填关键工艺, 工艺从进退法施工, 方量测量作业、施工船组调度等方面进行优化. 深厚软 土层上的“三合一” 船进退法分层回填关键工艺有着较高的施工效率, 有效解决了深厚软土层上的回填施工质量控制 问题, 可为深水条件下的大型填海项目提供参考和借鉴. [ABSTRACT FROM AUTHOR] |
Copyright of China Harbour Engineering is the property of Editorial Office of China Harbour Engineering and its content may not be copied or emailed to multiple sites or posted to a listserv without the copyright holder's express written permission. However, users may print, download, or email articles for individual use. This abstract may be abridged. No warranty is given about the accuracy of the copy. Users should refer to the original published version of the material for the full abstract. (Copyright applies to all Abstracts.) | |
Database: | Academic Search Complete |
FullText | Links: – Type: pdflink Text: Availability: 0 CustomLinks: – Url: https://resolver.ebsco.com/c/xy5jbn/result?sid=EBSCO:a9h&genre=article&issn=20957874&ISBN=&volume=44&issue=10&date=20241001&spage=91&pages=91-96&title=China Harbour Engineering&atitle=%E6%B7%B1%E5%8E%9A%E8%BD%AF%E5%9C%9F%E5%B1%82%E4%B8%8A%E2%80%9C%E4%B8%89%E5%90%88%E4%B8%80%E2%80%9D%E8%88%B9%E8%BF%9B%E9%80%80%E6%B3%95%E5%88%86%E5%B1%82%E5%9B%9E%E5%A1%AB%E5%85%B3%E9%94%AE%E5%B7%A5%E8%89%BA.&aulast=%E7%8E%8B%E5%86%9B%E4%BC%9F&id=DOI:10.7640/zggwjs202410016 Name: Full Text Finder (for New FTF UI) (s8985755) Category: fullText Text: Find It @ SCU Libraries MouseOverText: Find It @ SCU Libraries |
---|---|
Header | DbId: a9h DbLabel: Academic Search Complete An: 180511667 AccessLevel: 6 PubType: Academic Journal PubTypeId: academicJournal PreciseRelevancyScore: 0 |
IllustrationInfo | |
Items | – Name: Title Label: Title Group: Ti Data: 深厚软土层上“三合一”船进退法分层回填关键工艺. – Name: TitleAlt Label: Alternate Title Group: TiAlt Data: Key technology of layered backfilling by "self-priming and self-unloading" ship advance and retreat method on deep soft soil layers. – Name: Author Label: Authors Group: Au Data: <searchLink fieldCode="AR" term="%22王军伟%22">王军伟</searchLink><relatesTo>1</relatesTo><i> 303661244@qq.com</i><br /><searchLink fieldCode="AR" term="%22王远峰%22">王远峰</searchLink><relatesTo>2</relatesTo><br /><searchLink fieldCode="AR" term="%22张壮壮%22">张壮壮</searchLink><relatesTo>2</relatesTo><br /><searchLink fieldCode="AR" term="%22李承柱%22">李承柱</searchLink><relatesTo>2</relatesTo> – Name: TitleSource Label: Source Group: Src Data: <searchLink fieldCode="JN" term="%22China+Harbour+Engineering%22">China Harbour Engineering</searchLink>. Oct2024, Vol. 44 Issue 10, p91-96. 6p. – Name: Subject Label: Subject Terms Group: Su Data: *<searchLink fieldCode="DE" term="%22SOIL+depth%22">SOIL depth</searchLink><br />*<searchLink fieldCode="DE" term="%22QUALITY+control%22">QUALITY control</searchLink><br />*<searchLink fieldCode="DE" term="%22VOLUME+measurements%22">VOLUME measurements</searchLink><br />*<searchLink fieldCode="DE" term="%22PROBLEM+solving%22">PROBLEM solving</searchLink><br />*<searchLink fieldCode="DE" term="%22SILT%22">SILT</searchLink> – Name: Abstract Label: Abstract (English) Group: Ab Data: In order to solve the problems of high water content, low strength and large average thickness of the soft soil layer in the backfilling operation area in the reclamation development project (Phase I) of the SM Group in Pasai City, Philippines, when direct reclamation is carried out, the foundation is prone to silt squeezing and local instability, which affects the quality of subsequent construction, the key technology of layered backfilling by the "self-priming and self-unloading" ship advance and retreat method on deep soft soil layer is proposed, and the technology is optimized from the aspects of advance and retreat construction, volume measurement, construction fleet scheduling, etc. The key technology of layered backfilling by the "self- priming and self-unloading" ship advance and retreat method under the backfilling on deep soft soil layers has high construction efficiency, effectively solving the quality control problem of backfilling construction on deep soft soil layers, and can provide reference and inspiration for large-scale reclamation projects under deep water conditions. [ABSTRACT FROM AUTHOR] – Name: Abstract Label: Abstract (Chinese) Group: Ab Data: 为了解决在菲律宾帕賽市-SM集团吹填开发项目 (1期) 中存在的回填作业区软土层含水率高、强度低, 平 均厚度大, 直接吹填施工时, 地基极易出现挤淤及局部失稳, 影响后续施工质量的问题, 提出了深厚软土层上的 “三合一”船进退法分层回填关键工艺, 工艺从进退法施工, 方量测量作业、施工船组调度等方面进行优化. 深厚软 土层上的“三合一” 船进退法分层回填关键工艺有着较高的施工效率, 有效解决了深厚软土层上的回填施工质量控制 问题, 可为深水条件下的大型填海项目提供参考和借鉴. [ABSTRACT FROM AUTHOR] – Name: AbstractSuppliedCopyright Label: Group: Ab Data: <i>Copyright of China Harbour Engineering is the property of Editorial Office of China Harbour Engineering and its content may not be copied or emailed to multiple sites or posted to a listserv without the copyright holder's express written permission. However, users may print, download, or email articles for individual use. This abstract may be abridged. No warranty is given about the accuracy of the copy. Users should refer to the original published version of the material for the full abstract.</i> (Copyright applies to all Abstracts.) |
PLink | https://login.libproxy.scu.edu/login?url=https://search.ebscohost.com/login.aspx?direct=true&site=eds-live&scope=site&db=a9h&AN=180511667 |
RecordInfo | BibRecord: BibEntity: Identifiers: – Type: doi Value: 10.7640/zggwjs202410016 Languages: – Code: chi Text: Chinese PhysicalDescription: Pagination: PageCount: 6 StartPage: 91 Subjects: – SubjectFull: SOIL depth Type: general – SubjectFull: QUALITY control Type: general – SubjectFull: VOLUME measurements Type: general – SubjectFull: PROBLEM solving Type: general – SubjectFull: SILT Type: general Titles: – TitleFull: 深厚软土层上“三合一”船进退法分层回填关键工艺. Type: main BibRelationships: HasContributorRelationships: – PersonEntity: Name: NameFull: 王军伟 – PersonEntity: Name: NameFull: 王远峰 – PersonEntity: Name: NameFull: 张壮壮 – PersonEntity: Name: NameFull: 李承柱 IsPartOfRelationships: – BibEntity: Dates: – D: 01 M: 10 Text: Oct2024 Type: published Y: 2024 Identifiers: – Type: issn-print Value: 20957874 Numbering: – Type: volume Value: 44 – Type: issue Value: 10 Titles: – TitleFull: China Harbour Engineering Type: main |
ResultId | 1 |